Westside High School Fluid Cooler and Enclosure

Omaha, Nebraska

Keeping a Campus Comfortable Through New Cooling Infrastructure

Westside High School added a new fluid cooler system, keeping classrooms, offices, and common spaces comfortable for teachers, students, and staff. 7er Construction delivered the $2 million project, building both the cooling system and the structural enclosure that houses it.

Work began below grade with selective demolition, site grading, excavation, and new underground piping and utilities. Our team then placed the structural foundation and equipment pads to support our steel, precast concrete enclosure, and the fluid cooler.

We installed the new fluid cooler and associated equipment in the new exterior enclosure. The electrical team set transformers and gear to pull in a separate electrical service to power the new system. Inside the school's mechanical spaces, we installed pumps, heat exchangers, and tanks that distribute water throughout the building while supporting temperature control. Crews ran new piping and control wiring, connecting everything to the building's existing systems. The team worked closely with the district to test and commission the integrated system before turning it over.

Because school remained in session throughout the spring semester, work was sequenced around students' learning and extracurricular activities to reduce disruptions. The project team maintained weekly communication with the Athletic Director, particularly during sidewalk replacement, to ensure athletes, visitors, and other occupants had safe points of entry and exit during sporting events, band activities, and other school events. Parking lot closures and building system shutdowns required for tie-ins were scheduled in advance to further minimize disruptions to school operations.

With the new system in place, Westside High School is equipped to stay cool and comfortable for years to come.

Ready to start your project?

Let’s talk about what you’re building.

Start a Conversation

Hear it from the Clients.

Thank you all for showing up today and advocating for Omaha Face. I was incredibly impressed. It truly meant a lot to see that level of commitment and professionalism. It brought me right back to the moment I changed my mind and made the call to move forward with 7er Construction. It was not a decision I made lightly. Today, I reaffirmed that it was the right one. Small business is a tough world, and I really appreciate you guys going to bat for the small guys. It doesn't go unnoticed.

Ashley Harbison
Owner of Omaha Face

Professional people working in a transparent manner as a team.

Chris Bilau
Project Manager at Project Advocates

Communication was very good throughout the process. Patrick was well organized and kept me apprised of everything going on at all points of the project.

Jay Dostal
Principal at Westside High School

Built on trust.

Proven by clients who keep coming back.