When Northwest High School set out to modernize its learning spaces, the $2 million renovation became an investment into the school’s future.
Outdated classrooms were transformed into hands-on learning environments. Touchscreen technology now supports Esports and Computer-Aided Design (CAD) programs, where students can move seamlessly from 2D drafting to 3D modeling and other real-world design applications. A new pneumatic and electrical training center equips them to troubleshoot and repair compressed-air systems, preparing them for careers in technical trades.
The athletics department received a renovation as well. The expanded weight room features turf, an AV system, and state-of-the-art equipment, creating a dynamic training space for student-athletes. New athlete and referee locker rooms, along with a team planning room, enhance the overall athletic experience.
Partnering with BVH Architecture and Morrissey Engineering, 7er Construction brought the vision to life by blending technology, training and teamwork into spaces designed to inspire.